STC Signed Suining Leachate Spray System Contract
Time:2016-12-20
Adjacent to the existing municipal landfill site, Suining Municipal Waste to Energy Project locates in Guiling Village, Fuqiao Town, Suining City in Sichuan Province. With the total capacity of 800 ton per day, the plant is design with two boilers allied with two furnances respectively of which the waste disposal volume is 400 ton/day each line. The power is generated by the turbo generator with the overheated steam from the boiler in ordre to recycle the energy from the waste. STC has supplied the leachate back-injection system in the project and provide the design, manufacturing, erection, civil work, commissioning, training as well as the after service for the customer.